
New TopShim run:

version = topshim 2.4.0
date = 2026-10-29
time = 16:07:56.953
command = topshim  1d tuneaxyz

FINE SHIMMING

Parameters:

probe = Z108618_0305
solvent = DMSO
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 2.49 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 3.6 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration  2: FWHM Before= 0.3 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration  3: FWHM Before= 0.3 Hz, Target= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.412


Performing tune after shimming
tune lock level increase = 1.0

shim changes: 
Z	-89
Z2	+74
Z3	-207
Z4	-572
Z5	-41
Z6	+4403

duration = 1 min 7 sec
completed successfully
finished Thu Oct 29 16:09:02 2026


========================================================================
