
New TopShim run:

version = topshim 2.4.0
date = 2026-10-15
time = 20:14:18.646
command = topshim  1d tuneaxyz

FINE SHIMMING

Parameters:

probe = Z108618_0305
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.1 Hz, Target= 0.6 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.657


Performing tune after shimming
tune lock level increase = 1.0

shim changes: 
Z	+29
Z2	-24
Z3	-40
Z4	+128
Z5	+253

duration = 2 min 21 sec
completed successfully
finished Thu Oct 15 20:16:38 2026


========================================================================
