New TopShim run:

version = topshim 2.4.0
date = 2026-10-15
time = 19:24:17.580
command = topshim  1d tuneaxyz

FINE SHIMMING

Parameters:

probe = Z108618_0305
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 1.1 Hz, Target= 0.5 Hz, After= 0.5 Hz
Iteration  2: FWHM Before= 0.5 Hz, Target= 0.6 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.571


Performing tune after shimming
tune lock level increase = 1.0

shim changes: 
Z	+14
Z2	-19
Z3	-126
Z4	-63
Z5	+619

duration = 1 min 23 sec
completed successfully
finished Thu Oct 15 19:25:39 2026


========================================================================