
New TopShim run:

version = topshim 2.4.0
date = 2025-12-05
time = 15:38:32.308
command = topshim  1d tuneaxyz

FINE SHIMMING

Parameters:

probe = Z108618_0305
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 0.6 Hz, Target= 0.4 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.592


Performing tune after shimming
tune lock level increase = 1.0

shim changes: 
Z	-8
Z2	-169
Z3	-57
Z4	-781
Z5	+1422

duration = 2 min 15 sec
completed successfully
finished Fri Dec  5 15:40:46 2025


========================================================================
