
New TopShim run:

version = topshim 2.4.0
date = 2025-11-28
time = 15:29:12.028
command = topshim  1d tuneaxyz

FINE SHIMMING

Parameters:

probe = Z108618_0305
solvent = Acetone
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 2.04 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before=10.1 Hz, Target= 0.2 Hz, After= 0.2 Hz
Iteration  2: FWHM Before= 0.2 Hz, Target= 0.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.378


Performing tune after shimming
tune lock level increase = 1.1

shim changes: 
Z	-178
Z2	-25
Z3	-262
Z4	+369
Z5	+309

duration = 1 min 7 sec
completed successfully
finished Fri Nov 28 15:30:17 2025


========================================================================
