
New TopShim run:

version = topshim 2.4.0
date = 2025-11-25
time = 16:40:10.404
command = topshim  1d tuneaxyz

FINE SHIMMING

Parameters:

probe = Z108618_0305
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 1.6 Hz, Target= 0.4 Hz, After= 0.6 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.16


Performing tune after shimming
tune lock level increase = 1.0

shim changes: 
Z	-12
Z2	-167
Z3	+754
Z4	-256
Z5	-1123

duration = 2 min 0 sec
completed successfully
finished Tue Nov 25 16:42:09 2025


========================================================================
