
New TopShim run:

version = topshim 2.4.0
date = 2025-10-10
time = 00:12:38.546
command = topshim  1d tuneaxyz

FINE SHIMMING

Parameters:

probe = Z108618_0305
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.9 Hz, Target= 0.3 Hz, After= 0.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.425


Performing tune after shimming
tune lock level increase = 1.0

shim changes: 
Z	-46
Z2	-28
Z3	-149
Z4	+294
Z5	+629

duration = 1 min 36 sec
completed successfully
finished Fri Oct 10 00:14:13 2025


========================================================================
