
New TopShim run:

version = topshim 2.4.0
date = 2025-10-03
time = 10:19:14.266
command = topshim  1d tuneaxyz

FINE SHIMMING

Parameters:

probe = Z108618_0305
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 8.3 Hz, Target= 0.4 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.532


Performing tune after shimming
tune lock level increase = 1.0

shim changes: 
Z	-92
Z2	-50
Z3	-141
Z4	+182
Z5	+507

duration = 1 min 49 sec
completed successfully
finished Fri Oct  3 10:21:01 2025


========================================================================
