
New TopShim run:

version = topshim 2.4.0
date = 2025-10-02
time = 18:15:14.460
command = topshim  1d tuneaxyz

FINE SHIMMING

Parameters:

probe = Z108618_0305
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 7.6 Hz, Target= 0.2 Hz, After= 0.2 Hz
Iteration  2: FWHM Before= 0.2 Hz, Target= 0.2 Hz, After= 0.2 Hz
Iteration  3: FWHM Before= 0.2 Hz, Target= 0.2 Hz, After= 0.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.355


Performing tune after shimming
tune lock level increase = 1.1

shim changes: 
Z	-208
Z2	-74
Z3	-375
Z4	-813
Z5	+97

duration = 2 min 32 sec
completed successfully
finished Thu Oct  2 18:17:45 2025


========================================================================
